Where’s your red button?
By Craig Ryder — July 21, 2026
In this article Dave Jepson discusses the importance of understanding the conditions and criteria that together make up the ‘red button’ decision in change and transformation management.
One of Partners in Change’s early engagements was to provide assurance for a core platform replacement in a FTSE250 equivalent client. The customer had already left port on their journey but wasn’t over impressed with the service being received from their assurance partner. In our very first meeting with the customer I asked, ‘where’s your red button’? His eyes projected a question mark – nobody had ever asked at what point their programme should be stopped.
Here’s the thing. We all know the stories and ‘facts’ about major change going wrong, or failing to deliver. We’ll say more about this later in our content series, but for now, accept that more change disappoints than thrills, and that amongst the disappointment are some total failures.
We shouldn’t be surprised at this: complex change for many organisations is akin to climbing an 8000m mountain – hazardous, challenging, exhausting: many try, few succeed.
Personally, I have no head for heights but have always been in awe of climbers: the risks they take; the way they apply their skills; the physical and mental agility required to plot a course, yet also to be ready and willing to change according to immediate circumstances. Crucially, the best mountaineers also know when to turn back. They have a ‘red button’; in their case it can be the difference between life or death. They understand that the mountain will still be there tomorrow.
For Partners in Change, programme recovery is often an entry point for us with new clients. A programme ‘gone wrong’ that needs rescuing.
Generally most such programmes can be saved. They are the equivalent of under-nourished or ill patients that just need a more balanced life plan and a short period of recuperation. Occasionally they cannot – there are programmes where the ship simply runs aground, or sinks – whether in a metaphorical storm, or due to a basic lack of seaworthiness. Either way, the failure has never been sudden and catastrophic; there have been signs, but they have been ignored, or missed.
Agreeing the ‘red button’ criteria
The key point here is that the programme did not fail simply because it was ill-conceived, or got unlucky; nor because there was no fall-back plan. Ultimately, any unexpected failure occurs because there was no agreement at the outset about the circumstances under which activity might be paused, or stopped. And this requires two things to be pre-arranged:
(i) the indicators or measures that determine the acceptable threshold; and
(ii) the psychological safety to call-out the danger
The former is easier to grasp; the latter much harder, and rarely considered.
Establishing the red lines makes calling out the risk much less contentious: there is no debate in the moment about whether the line is in the right place, or whether it should exist at all. Back to the mountaineer: death is always a risk at high altitude, but there are conditions which tip the risk too far, and into territory where it would be stupid and reckless to continue. If they are in any doubt, they call a halt: the decision can be made quickly, without rancour, and with no ill-feeling, usually because it was discussed and understood by all stakeholders in advance.
The ‘fail-learn’ cycle
In my professional life I’ve always taken an interest in human disasters, particularly because the ‘fail-learn’ cycle is a fundamental part of continuous improvement (so long as it happens).
The failure of a complex change programme rarely cost lives the way an aircrash, sinking ferry, or war does, but the underlying psychology is often similar, and lessons can be transferred between contexts.
In the aftermath of the Challenger Shuttle disaster, it emerged that it was known that the ‘o’-rings that failed and triggered the fatal explosion would be operating outside their design tolerance, but this known risk was considered and dismissed: a key element of this was management ‘groupthink’, and specifically a desire not to press the metaphorical red-button because to stop would be seen as a failure.
The Tenerife air accident in 1977, still the most catastrophic air accident in history, was another with several complex ingredients combining to create a heady cocktail, but the most significant was the role of the senior ranking officer on the KLM flight who overruled the correct caution of the pilots in seats one and two and commanded that the plane take-off, fatally.
The point is, when an activity, or a change programme, is sponsored and championed by someone with a majority of the positional power, or perhaps the knowledge power, and particularly if they are over inclined to charismatic leadership, those around them may be loath to call-out or challenge, even when there is compelling cause to do so.
We will probably all have heard at least once in our lives that phrase, ‘Well; I’m not telling them. You can if you want, but on your head be it.” So, when embarking on a major change programme, the plans, the resources and delivery team, the method and tools, the solution – are all essential, but don’t just bank on a ‘happy’ voyage.
Assume things may go wrong: third party assurance will help guard against this, but there’s no point having the equivalent of the ‘red zone’ on the rev counter if you’re going to ignore it and risk blowing the engine. Make sure that in addition you have made clear the parameters at which point consideration will be given to a slow down or pause, and, more importantly, that you have established the culture that allows for consequent concerns to be called out.
The importance of emotional contingency
We often talk about contingency in programmes, but in my experience this refers only to cash or time; we never think about emotional contingency, but this is fundamental. And the contingency is both collective (the team need to have the freedom to challenge) and also (most importantly) individual.
Leaders need to be open to challenge: in fact, they should perhaps demand that it happen when necessary, rather than requiring rare and potentially career-limiting courage.
There are geopolitical events in the world right now (all of which I think have been triggered by men) which strike me as being the modern equivalent of Tenerife or Cape Canaveral, where I wonder whether the conditions exist where leaders are open to challenge; and where, if they do not exist, but they were to, the outcomes might be very different and more positive.
I doubt any readers of this will have the ear of any global leaders, but we may be managing complex change, or have the attention of someone who is.
So, before you launch your next major change programme, or if you’ve recently left port, don’t just check for the usual governance and control. Ask yourself two more fundamental questions:
Do you have a red button for your programme, with clear indicators as to when consideration should be given to pressing it?
And,
Have you created the culture in the programme where it is safe to suggest that it be pressed?